Dalaman Airport — Backup Generator Deployment
Client
YDA Airport Operations Inc.
Location
Dalaman, Muğla
Year
2024
Category
mobil-vinc
Case Study
Our approach and execution
Placement of a 38-tonne backup generator within 6 hours during overnight operation.
Due to the airport's uninterrupted operation requirement, a 70-tonne Tadano crane unit was deployed for the operation scheduled between 02:00 and 08:00. The entire operation process was conducted in coordination with the Directorate General of Civil Aviation.